CO129-163 - Sir Kennedy - 1873 [4-6] — Page 227

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

# Committee with

to

make

cost

of

the

preliminary

with

a

suitable plan,

the

estimate

of

and to obtain

the

tenders for

with a view to arriving

at

some idea of its correctness.

"The Surveyor General

submitted a plan which, having

been considered suitable by the

Harbor Master,

was

approved by

the Committee, and it was ascertained that

a Contractor

of

the name of

Atan would

undertake the work,

viz., the erection of the building above ground for Fifteen Thousand Dollars ($15,000), while another,

named Yune-Leey

would do

it at Twelve

Thousand Dollars ($12,000), the work

to be according to specification,

and hardwood to be used throughout: these figures included the

expense of removing the old building, and the Contractor was to be allowed to make

use

of the old materials as

the Surveyor

General might

approve.

The

Committee find, from the Surveyor

General's report,

that the foundation can

be laid at the

cost of Fifteen

Thousand Dollars ($15,000), while

it will probably cost considerably

Edit History

2026-05-21 02:44:24 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
# Committee with to make cost of the preliminary with a suitable plan, the estimate of and to obtain the tenders for with a view to arriving at some idea of its correctness. "The Surveyor General submitted a plan which, having been considered suitable by the Harbor Master, was approved by the Committee, and it was ascertained that a Contractor of the name of Atan would undertake the work, viz., the erection of the building above ground for Fifteen Thousand Dollars ($15,000), while another, named Yune-Leey would do it at Twelve Thousand Dollars ($12,000), the work to be according to specification, and hardwood to be used throughout: these figures included the expense of removing the old building, and the Contractor was to be allowed to make use of the old materials as the Surveyor General might approve. The Committee find, from the Surveyor General's report, that the foundation can be laid at the cost of Fifteen Thousand Dollars ($15,000), while it will probably cost considerably
Baseline (Original)
6. # Committee with to make cost of the preliminam with a awn а suitable plan, the estimate same of and to obtain the tenders for t view to arriving idea of its correctness. - at some "The Surouper General plan which having submitted been considered suitable by the Harbor Master, was approved by the Committee, and it was ascertained that @ Contractor of the name of Atan would the undertake the work, vizt erection of the building above ground for Fiftien Thousand hollars ($15,000) while another, named Contract Leey would Yune-Leey for it at Twelve 223 Thousand Dollars ($12,000), the work to be according to specification, and hardwood to be used through out : these figures included the expense of removing the old building, and the Contractor was to be allowed to make such Mse the old materials as of the Surveyer approve. The General might foundation, the of Committee find, from the Suruyor General Can outside for a be laid at the cost of Fifteen Thousand Bollase ($ 15,000), while it will probably cost considerably
2026-05-21 02:44:24 · Baseline
View content

6.

# Committee with

to

make

cost

of

the

preliminam

with

a

awn

а

suitable plan,

the

estimate

same

of

and to obtain

the

tenders for t

view to arriving

idea of its correctness. -

at

some

"The Surouper General

plan which having

submitted

been considered suitable by the

Harbor Master,

was

approved by

the Committee, and it was ascertained that

@

Contractor

of

the

name

of Atan would

the

undertake the work,

vizt

erection of the building above ground for Fiftien Thousand hollars ($15,000) while another,

named

Contract

Leey would

Yune-Leey

for

it at Twelve

223

Thousand Dollars ($12,000), the work

to be according to specification,

and hardwood to be used

through

out : these figures included the

expense of removing the old building, and the Contractor was to be allowed to make

such

Mse

the old materials as

of the Surveyer

approve.

The

General might

foundation, the

of

Committee find, from the Suruyor

General

Can

outside for

a

be laid at the

cost of Fifteen

Thousand Bollase ($ 15,000), while

it will probably cost considerably

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.